Back to Job Search

BIM Coordinator - Data Centre Construction

Job Description

BIM Coordinator - Data Centre Projects, Europe

On behalf of our client, a mechanical building services contractor expanding its footprint on data centre developments across Europe, we are recruiting a BIM Coordinator to join the project delivery team on a 27MW hyperscale data centre, located approximately 25 minutes from Frankfurt airport.

Key Responsibilities

  • Build and maintain models and reporting outputs in line with company standards.
  • Produce general arrangement drawings and detailing sheets.
  • Support and help drive the transition from 2D working to full 3D delivery.
  • Maintain drawing control processes and keep drawing registers and schedules current.
  • Support the rollout of 3D tools with BIM technicians, 4D with project teams, 5D with the estimating function, 6D with operations, and 7D with the FM team.
  • Assist with establishing off-site drawing and model storage/control processes.
  • Contribute to the ongoing development of BIM protocols and systems, including showcasing BIM capability to external clients and consultants where required.
  • Champion the value of BIM internally and support training and mentoring of staff completing training modules.
  • Support continuous improvement of the integrated management system, keeping abreast of emerging technology.
  • Prepare material procurement schedules and requisition timelines for projects.
  • Liaise with subcontractors, client consultants and the main contractor to ensure correct on-site installation.

 

Requirements

  • Third-level qualification or relevant trade background advantageous.
  • Minimum 2 years' experience in a similar position.
  • Able to build 3D construction models from source data, P&IDs, facility scans and point-cloud data.
  • Able to produce construction-level detailing to support automated isometric and BOM generation.
  • Experience with clash detection and management across building services systems.
  • Strong problem-solving ability to resolve coordination and design issues.
  • Comfortable carrying out field surveys and verification.
  • Experience developing 3D coordination models and structural layouts for clash avoidance.
  • Able to produce builders' work schedules and associated drawings.
  • Skilled in producing 2D/3D design drawings, prefabrication isometrics and detail drawings.